Control points
Six checks between roving and truck
Check 01
Incoming material
Roving, mat, veil and resin verified against supplier certificates; batch numbers logged before issue to the line.
Check 02
Resin mix & catalyst
Weighed mixes with recorded catalyst and filler ratios — the cure profile is repeatable run to run.
Check 03
Die temperature zones
Zone temperatures and pull speed monitored through the run to keep the cure and surface finish consistent.
Check 04
Dimensional check
Section dimensions, wall thickness, straightness and squareness measured at set intervals against the drawing.
Check 05
Mechanical & load test
Barcol hardness for cure, plus load and deflection checks on tray and grating samples from the run.
Check 06
Packing & despatch
Edge-protected bundling, item marking and a packing list matched to the bill of quantities before loading.
Infrastructure
The Por GIDC plant
Strategically situated in the fast-growing industrial zone of Kashipura–Por, our plant is equipped with advanced production technology and world-class infrastructure. The location offers excellent connectivity, ensuring smooth delivery across India and to global markets.
- Pultrusion
- Multiple lines with interchangeable dies
- Fabrication
- Cutting, drilling, notching and bonding bay
- Assembly
- Tray, ladder and handrail sub-assembly
- Stores
- Covered stock of standard sections

